Why the order matters
Most problems on site are decisions that were taken too late, or taken twice. A structured process exists to front-load the thinking: the plan is resolved before materials are chosen, and materials are chosen before anything is ordered or built.
It also gives you defined moments to change your mind cheaply. Moving a wall in concept design costs a drawing; moving it during construction costs a variation order, programme delay and, often, the relationship with your contractor.
The five stages
- 01
Consultation and brief
The designer visits or reviews the space, and you talk through how you live or operate, what you own already, budget range and timeline. On villa projects this stage also covers plot conditions and any developer or community guidelines that constrain the design.
- 02
Concept design
Space planning and zoning, an overall design direction, and an early material and colour palette. You should be shown layouts and a sense of atmosphere — not a finished picture of every room.
- 03
Design development
The scheme is refined: layouts, elevations, sections, ceiling and lighting plans, plus 3D visualisation so proportion and material can be judged. This is where the design is tested against regulations, budget and buildability.
- 04
Detailed design and FF&E
Technical drawings and joinery details, finishes and hardware, lighting specification and the furniture schedule. The output is a package a contractor and joiner can price and build from without inventing anything.
- 05
Coordination during construction
Shop drawings, samples and site queries are reviewed against the approved design, so what gets built matches what you approved.
What you should receive at each stage
- Concept: layouts, zoning, mood and material direction
- Design development: developed drawings, elevations and renders
- Detailed design: technical and joinery drawings, schedules and specifications
- FF&E: furniture, lighting and finish schedule with suppliers
- Construction: reviewed shop drawings, samples and site responses
Where clients slow their own projects down
Three things cause most delays: approving a concept that nobody has costed, changing the layout after detailed drawings have started, and selecting materials with long lead times late in the programme.
A good designer will push you to decide the expensive, structural things first — the plan, the openings, the stone — and leave the reversible decisions for later.